Glasshouse Realty logo
GREATER DAYTON
Blog · New Construction Tracker

October 13, 2026 · Subdivision & Plat Map Tracker

Washington Township Subdivision Tracker: 135 Luxury Homes at $1.3M-$2M, 52 Ranch Homes on Ohio 48, and the Clyo Road Widening Timetable

A new residential subdivision under construction in Washington Township, Ohio on a crisp October morning: a freshly paved cul-de-sac curving past completed craftsman and brick-trimmed homes, two partially framed houses, orange construction fencing, and maples turning orange and gold
PLATE 01 · NEW CONSTRUCTION IN WASHINGTON TOWNSHIP, MONTGOMERY COUNTY, OCTOBER 2026

Washington Township, the largest of Montgomery County's nine townships at about 63,479 residents, has roughly 500 new housing units in the approval or construction pipeline as of October 2026. The largest pieces: Design Homes' Mill Creek East and West (135 luxury single-family homes priced around $1.3M to $2M on Clyo and Nutt Roads), Peebles Homes' Savanna Walk (52 ranch homes on Ohio 48), and CRG Residential's Parkside Preserve (272 apartments at Yankee Street and West Spring Valley Pike, now leasing). This tracker lists who is building what, where the recorded plat maps live, what premium lots cost, and the road projects that will serve these neighborhoods.

In our practice helping buyers and sellers in Washington Township, the most common new-construction surprise is the gap between the sales-office map and the recorded plat. The plat that matters for your lot line is the one recorded with the Montgomery County Recorder, not the rendering in the model home. This page is the reference we hand buyers before they commit to a homesite. Every development, road project, and price range below was checked against township, county, ODOT, and builder records in October 2026. This is general education about new construction and subdivision records, not legal, tax, title, or mortgage advice; confirm current pricing, timelines, and contract terms with the builder, your attorney, and your title company before you act.

Which new subdivisions are under construction or approved in Washington Township right now?

The tracker below covers the developments that are actively selling, under construction, or publicly approved as of October 2026. Mill Creek East and West are the headline projects: 135 luxury homes on roughly 85 acres of combined ground, with lots running 0.35 to 0.76 acres at 90 to 100 feet of frontage and 160 to 175 feet of depth, all in the Centerville City Schools attendance area. Savanna Walk is a smaller, faster-moving project: 52 ranch-style homes on about 12 acres of a roughly 27-acre tract at 10165 Dayton Lebanon Pike, with floor plans from about 1,701 to 2,520 square feet. Parkside Preserve is the rental side of the pipeline, 272 apartments in 11 buildings on about 32 acres of former farmland just north of the Yankee Trace golf community.

TABLE 1 · WASHINGTON TOWNSHIP SUBDIVISION TRACKER: BUILDER, UNITS, LOCATION, STATUS, AND PRICE RANGE, VERIFIED OCTOBER 2026
Development Builder / developer Type Units Location Status (Oct 2026) Price range
Mill Creek East Design Homes Single-family luxury 38 North of Social Row Road along Clyo Road Approved; coming soon ~$1.3M-$2M
Mill Creek West Design Homes Single-family luxury 97 Clyo and Nutt Roads Approved late 2025; expansion of Washington Twp. Estates ~$1.3M-$2M
Savanna Walk Peebles Homes Ranch-style single-family 52 Ohio 48, between Hibberd Drive and Social Row Road Proposed July 2025; ~$22M project Plans 1,701-2,520 sq ft
Parkside Preserve CRG Residential Apartments (11 buildings) 272 Yankee Street and West Spring Valley Pike Broke ground Aug. 26, 2025; leasing 2026 Rents ~$1,419-$2,200+
Sorrento M/I Homes Single-family 10 floor plans 9014 Sorrento Place Now selling ~$478K-$855K
Washington Glen M/I Homes Single-family Multiple plans 10010 Washington Glen Drive Now selling From ~$539K
Downing Farm Peebles Homes Ranch bungalows, maintenance-free ~35 Off Social Row Road, west of Ohio 48 Selling From ~$477K
Heritage Station Not publicly detailed Luxury residential Part of 500+ unit pipeline Washington Township Proposed; reported Nov. 2024 Not published

Sources: Dayton Daily News reporting on Mill Creek, Savanna Walk, and Parkside Preserve; Design Homes; Peebles Homes; M/I Homes; NewHomeSource; and the Parkside Preserve community site, all accessed October 13, 2026. Builder price ranges move with each phase release; confirm current pricing with the sales office.

One context number matters for all of this: Washington Township (which includes the city of Centerville) counted 61,682 residents in the 2020 Census and is estimated at about 63,479 in 2026, with 27,627 households, according to the township's own demographic page. That is roughly 2.5 percent growth since 2020, and it is why the township's development review calendar is full. For school questions, the district boundary is the objective fact to check: most of these developments sit in the Centerville City Schools attendance area, and the district publishes its own boundary maps and enrollment data. Compare the district's published information against the exact address before you assume an assignment.

Where do I look up a plat map for a Washington Township lot?

A plat map is the official drawing of a subdivision: lot lines, dimensions, street rights-of-way, easements, and any dedicated public land. For unincorporated Washington Township land, the final approved plat is recorded with the Montgomery County Recorder under Ohio Revised Code Chapter 711, and that recording is the legally controlling document for your lot. There are four public places to look, and each shows something different:

  • Montgomery County Recorder: final recorded plats, the legal record of every subdivision. Plat books are public records and can be searched in person or through the recorder's office.
  • Montgomery County Auditor: the free GIS parcel viewer at mcohio.org/629/GIS shows parcel boundaries, ownership, and tax data on a map, plus archived plat books and map books.
  • Montgomery County Planning Commission: the platting authority for unincorporated township land, reviewing preliminary and final plats under the county's Subdivision Regulations, published at selectmcohio.com/planning.
  • Washington Township Development Services: the township publishes the zoning map, the Comprehensive Land Use Plan, the Future Land Use Map, and the Zoning Resolution at washingtontwp.org, and runs an online services portal for planning and zoning applications.

In practice, we use the Auditor's GIS viewer first because it is free and fast, then confirm the recorded plat through the Recorder when the lot line matters, which it always does for a new-construction lot that has not been built out yet. The Montgomery County Engineer also publishes private development design standards that govern how new subdivision roads are built, which is worth reading when a development promises a new street.

How much do builders charge for premium lots in Washington Township?

No Washington Township builder publishes a fixed dollar figure for lot premiums, because the premium is quoted per homesite during selection. What is consistent across the market is what a premium buys: pond or water views, wooded surroundings, walk-out basements, larger or irregular lots, and corner or cul-de-sac placement. At Mill Creek, the premium drivers are visible in the lot itself: 0.35 to 0.76 acres with 90 to 100 feet of frontage, on ground that slopes toward the creek corridor, so walk-out and daylight-basement sites carry the highest premiums. At Downing Farm, the price includes maintenance services (lawn care and snow removal), which is a different cost structure than a lot premium because it is a recurring service included in the purchase. At Washington Glen, the premium is partly amenity-driven: trails and resort-style common areas are funded through the community's assessments, so the base price and the monthly assessment both matter.

The practical takeaway: ask the sales office for the premium sheet for the exact phase you are buying, because premiums reset with every phase release and the same plan can carry a five-figure difference between a standard interior lot and a wooded walk-out. Then ask what the premium includes, because some builders roll the premium into the base price of the plan and others keep it as a separate line item that affects your loan amount and your tax basis.

What road and sewer infrastructure is being built to serve these subdivisions?

The two corridors carrying most of the new construction, Clyo Road and Social Row Road, both have funded improvement projects on the books. The City of Centerville and the Montgomery County Engineer are widening Clyo Road to a consistent three-lane roadway with a center turn lane between St. Leonard Way and Ole Quaker Court, including a new traffic signal at Dimco Way, under ODOT project 119553, with construction scheduled from spring 2028 through fall 2029 at an estimated cost of about $4.78 million. The Montgomery County Engineer is widening Social Row Road from two to five lanes from Waterbury Ridge Lane east to Sheehan Road, about 4,650 feet, with a shared-use path and stormwater treatment; construction began in June 2025 and runs to roughly September 2026 under a contract of about $7.1 million. ODOT also has a resurfacing project on Ohio 48 from the southern county line to Sheehan Road at about $1.64 million, and a safety upgrade at the Clyo and Bigger Road intersection scheduled for fall 2028 through summer 2030.

TABLE 2 · WASHINGTON TOWNSHIP INFRASTRUCTURE TIMELINE: ROAD AND SEWER PROJECTS SERVING NEW SUBDIVISIONS, VERIFIED OCTOBER 2026
Project Lead agency Scope Timeline Est. cost
Clyo Road widening City of Centerville / Montgomery County Engineer Three lanes with center turn lane, St. Leonard Way to Ole Quaker Court, signal at Dimco Way (ODOT PID 119553) Construction spring 2028-fall 2029 ~$4.78M
Clyo Road at Bigger Road ODOT Traffic-safety intersection upgrade (PID 119550) Construction fall 2028-summer 2030 ~$1.5M
Social Row Road, Phase 1 Montgomery County Engineer Two to five lanes, Waterbury Ridge Lane to Paragon Road, shared-use path (PID 113360) Began June 2025 Part of ~$7.1M contract
Social Row Road, Phase 2 Montgomery County Engineer Paragon Road to Sheehan Road (PID 115191) Through ~September 2026 Part of ~$7.1M contract
Ohio 48 resurfacing ODOT Southern Montgomery County line to Sheehan Road Programmed ~$1.64M
Mill Creek sewer capacity Montgomery County Engineer / developer Sewer capacity resolved after an earlier halt on the site Resolved; development proceeding Not published

Sources: ODOT project pages 119553 and 119550; Washington Township County Infrastructure Projects page; Montgomery County Engineer Social Row Road project page; Centerville news releases, all accessed October 13, 2026. Schedules and costs change with funding and weather; confirm current dates with the lead agency.

Sewer capacity is the infrastructure item buyers rarely see on a sales sheet, and it is the one that has actually stalled a Washington Township project. The Mill Creek site was halted early in its history when the county engineer's office said there was no sewer capacity for the development; that capacity question was later resolved, which is what allowed the project to proceed. Before you buy a new-construction lot anywhere in the township, ask the builder and the county engineer's office whether the site has a confirmed sewer allocation, because an unserved lot can sit for years.

How long does subdivision approval take in Montgomery County?

For unincorporated township land, the approval path runs through the Montgomery County Planning Commission, which reviews preliminary and final plats under the county's Subdivision Regulations. The township's Development Services department performs the preliminary development review and boards and commissions act on zoning matters, with applications and agendas published through the township's OpenGov portal. The sequence is preliminary plat, final plat, then recording with the Montgomery County Recorder, and the calendar is measured in months, not weeks. The Savanna Walk project was first reported in July 2025 and was still listed as coming soon in October 2026, which is a typical pace for a 52-lot subdivision. The Mill Creek West expansion was reported in late 2025 and approved as part of a combined 135-home program with Mill Creek East, showing how a builder with an approved site can move faster than a greenfield application.

How do I track what is coming next in Washington Township?

Four public feeds cover the pipeline. The Washington Township OpenGov portal publishes planning and zoning applications and board agendas. The Montgomery County Planning Commission publishes preliminary and final plat submissions on its meeting agendas. The Montgomery County Auditor GIS viewer shows parcel-level ownership, which is how you spot a large tract changing hands before a development application appears. And the township's County Infrastructure Projects page tracks the road work that usually precedes or follows a subdivision. If you are deciding between a resale home and a new build, the calendar on that infrastructure page is a better predictor of your future commute than the builder's marketing timeline.

Buyer and Seller Takeaways

  • Buyers: check the recorded plat with the Montgomery County Recorder, not the sales-office map, before you commit to a homesite. The Auditor's free GIS viewer at mcohio.org/629/GIS is the fastest first look.
  • Buyers: ask for the lot premium sheet for the exact phase you are buying. Premiums reset with every phase release, and wooded, walk-out, pond, and cul-de-sac sites carry five-figure spreads on the same floor plan.
  • Buyers: confirm sewer allocation with the builder and the county engineer's office. The Mill Creek site stalled on sewer capacity before it was resolved, and an unserved lot can sit for years.
  • Buyers: put the road calendar in your commute math. Clyo Road construction runs spring 2028 to fall 2029, and Social Row Road work runs through roughly September 2026, so a new-build buyer on those corridors should plan around construction traffic.
  • Sellers: if you list near an approved subdivision, disclose the active construction and the road projects in the disclosure statement, and price with the finished-road timeline in mind.
  • Everyone: this is general education about subdivision records and new construction, not legal, tax, title, or mortgage advice. Builder contracts, incentives, and assessments are negotiable documents; review them with your attorney, and have your lender and title company review the transaction-specific terms.

The subdivision tracker pairs naturally with the other guides in this series. Our Washington Township market watch page tracks median prices, days on market, and inventory for the township, our guide to how new construction affects Dayton resale values explains what a wave of new builds does to existing-home pricing nearby, and our guide to moving to Dayton covers neighborhoods, schools, commute times, and cost of living for the whole metro.

Frequently Asked Questions

Where can I look up a plat map for a Washington Township lot for free?

The Montgomery County Auditor's GIS parcel viewer at mcohio.org/629/GIS is the free first stop: it shows parcel boundaries, ownership, and tax data on a map, plus archived plat books and map books. The legally controlling document is the final plat recorded with the Montgomery County Recorder under Ohio Revised Code Chapter 711, which is a public record you can search in person or through the recorder's office. The Montgomery County Planning Commission reviews plats for unincorporated township land under the county's Subdivision Regulations, published at selectmcohio.com/planning.

What is the difference between a plat map and a zoning map?

A plat map shows the physical layout of a subdivision: lot lines, dimensions, street rights-of-way, and easements, and it is recorded as a legal land record. A zoning map shows the use and density rules that apply to land, such as single-family residential, and it is adopted by the township or city. A plat can be recorded while the underlying zoning stays unchanged, and a zoning change can happen without a plat. For a new-construction purchase you need both: the plat for your lot line and the zoning for what can be built on it, with Washington Township's zoning map published at washingtontwp.org.

Which new subdivisions are selling right now in Washington Township?

As of October 2026, M/I Homes is selling Sorrento (from about $478K to $855K at 9014 Sorrento Place) and Washington Glen (from about $539K at 10010 Washington Glen Drive), and Peebles Homes is selling Downing Farm (from about $477K off Social Row Road west of Ohio 48). Design Homes' Mill Creek East and West, about 135 luxury homes at $1.3M to $2M on Clyo and Nutt Roads, are approved and coming soon. Confirm current availability with each sales office, because phases sell out and price ranges move.

How much do builders charge for premium lots in Washington Township?

No Washington Township builder publishes a fixed premium dollar figure; premiums are quoted per homesite during selection. The features that carry premiums are consistent: pond or water views, wooded surroundings, walk-out basements, larger or irregular lots, and corner or cul-de-sac placement. At Mill Creek, walk-out and daylight-basement sites on the creek corridor carry the highest premiums. Ask the sales office for the premium sheet for the exact phase you are buying, because premiums reset with each phase release.

When will the Clyo Road widening be finished?

The City of Centerville and the Montgomery County Engineer are widening Clyo Road to three lanes with a center turn lane between St. Leonard Way and Ole Quaker Court, including a new signal at Dimco Way, under ODOT project 119553. Construction is scheduled from spring 2028 through fall 2029 at an estimated cost of about $4.78 million. A related safety upgrade at the Clyo and Bigger Road intersection is scheduled for fall 2028 through summer 2030 at about $1.5 million. Schedules shift with funding and weather; confirm current dates with ODOT or the city.

Do I need to worry about sewer capacity when buying new construction in Washington Township?

Yes, it is worth confirming. The Mill Creek site was halted early when the Montgomery County engineer's office said there was no sewer capacity for the development, and that capacity question was later resolved so the project could proceed. Before you commit to a new-construction lot anywhere in the township, ask the builder and the county engineer's office whether the site has a confirmed sewer allocation. An unserved lot can sit for years, and sewer availability is not something a sales sheet always states.

Sources

Share This Post

Suggested social caption

"Washington Township's new construction pipeline, tracked: Design Homes' Mill Creek East and West (135 luxury homes at $1.3M-$2M on Clyo and Nutt Roads), Peebles Homes' Savanna Walk (52 ranch homes on Ohio 48), and Parkside Preserve's 272 apartments now leasing. Plus where the plat maps live, what premium lots cost, and the Clyo Road widening timetable through fall 2029. From Glasshouse Realty."

Published October 13, 2026 · Updated October 13, 2026 · Information verified on October 13, 2026 against the township, county, ODOT, and builder records listed above. Development status, pricing, lot premiums, and construction schedules change; confirm the current status with the builder and the lead agency before you act, and consult your attorney, title company, and lender for transaction-specific questions.

Comparing a new build and a resale in Washington Township?

Whether you are weighing a Mill Creek homesite against a resale near Social Row Road, or you want the recorded plat and sewer allocation checked before you sign, a Glasshouse agent can walk through the subdivision records, lot premiums, and road timelines for the exact property.

Talk to an Agent
Let's Connect

Buying new construction in Washington Township?

Whether you are comparing Mill Creek and Savanna Walk homesites, checking a recorded plat on the county GIS, or confirming sewer allocation for a lot, a Glasshouse agent can pull the subdivision records and road timelines for the exact property before you commit.

No pressure, no guesswork. Just clear, local answers from a team that knows the Miami Valley block by block.

Schedule a Consultation